SCRIPT (2)
The script is in final working order, the module has been configured in its entirety (for the moment) and the process of arraying and thickening has now been performed without a snag. Ideally, there will be a component in the module that changes over the course of the array via a variable within the script and pressure within the building or site. This should be fleshed out this week. The program study will determine the form of the building and resultant facade by Monday (4/7/08). The rough render below illustrates the modular field in its current state. Apologies for the rough quality, it is the result of a technical battle that has been waged since the scripting started.
Popularity: 9% [?]
Related Content
























No Comments, Comment or Ping
Reply to “SCRIPT (2)”
You must be logged in to post a comment.